2 min read
Building owners often ask what a chiller replacement costs. The honest answer is that it depends on the building: two plants of the same tonnage can differ several times in price. This guide explains the factors that set the price, so you can compare quotes properly, and how to replace a plant without capital spending.
Plant size, measured in tons of refrigeration (TR), is the starting point, but the design load matters as much as the nameplate. Many older plants are oversized, so a proper load study can reduce the capacity you need to buy. Redundancy adds cost: hospitals and data centers usually need N+1 or better, which means at least one extra chiller and matching pumps.
Higher-efficiency equipment costs more to buy and less to run. Options include variable-speed drives, magnetic-bearing compressors and water-cooled or air-cooled designs. Because a chiller runs for many years, energy cost usually outweighs purchase price over its life, so compare offers on lifetime cost, not purchase price alone.
The chillers are only part of the bill. A replacement often also covers:
Access often drives cost more than equipment does. Removing old chillers from a basement or a rooftop may need cranes, temporary openings or road closures. Structural reinforcement, noise limits and work-hour restrictions all add time and cost.
Most buildings cannot switch cooling off. Phased installation, temporary chillers and night or weekend switchovers keep the building running but add to the project cost. Hospitals, data centers and hotels need the most careful planning.
Older chillers may use refrigerants that are being phased out. Recovering and disposing of them correctly is part of the job, and choosing a refrigerant with a long future protects the new plant's value.
The cheapest plant to buy is rarely the cheapest to own. Maintenance contracts, spare parts, water treatment and the skill of the operators decide whether a new plant keeps its design efficiency or slowly drifts back to the old one's performance.
With Cooling-as-a-Service, Infinity CoolMaster funds, installs, owns and operates the new plant. You pay for efficient cooling out of the savings, with a minimum 10% energy saving guaranteed in writing and measured every month to IPMVP. The audit that sets the price is free: we analyse 12 months of your electricity bills and survey your plant.