Cooling as a service for shopping malls

We cut a shopping mall’s cooling cost without capital spending: either by optimising the existing chiller plant or by funding and installing a new one. A minimum 10% energy saving is guaranteed in the contract and verified every month to IPMVP.

Cooling is a mall’s largest controllable cost

Shopping malls live on comfort: shoppers stay longer in a cool, fresh building. But the cooling load swings widely with footfall, weather, cinema schedules and tenant mix, and a plant run at fixed settings wastes a large share of its energy.

Not every mall needs new chillers. Where the existing plant is in good condition, optimisation of the controls alone can deliver verified savings.

How chiller-as-a-service works for shopping malls

  • We design, finance, install and operate a high-efficiency chilled-water plant at your site. You pay nothing upfront.
  • Infinity CoolMaster owns, insures and maintains the equipment for the whole contract, so it never sits on your balance sheet.
  • You pay for efficient cooling out of the savings the new plant creates, so cash flow is positive from the first month.
  • A minimum 10% energy saving is written into the contract and measured every month against an IPMVP-aligned baseline. If savings fall short, we pay the difference.
  • Contracts typically run 5–10 years. At the end you can renew, or take ownership of the plant under agreed transfer terms.

Retrofit or replace

  • Retrofit: we add our CPMS control layer and machine-learning optimisation to the existing plant and air-handling units.
  • Replace: where chillers are near end of life, we fund and install a new high-efficiency plant.
  • Either way the saving is guaranteed in the contract and verified every month.

Frequently asked questions

Do we need to invest anything?

No. Design, equipment, installation and operation for the life of the contract are financed by Infinity CoolMaster. You pay for cooling from the savings the system creates.

Do we have to replace our chillers?

Not necessarily. After the free audit we recommend either optimising the existing plant or replacing equipment, whichever gives the better guaranteed result.

Will installation disrupt our operations?

No. Work is planned around your operating schedule, switchovers happen off-hours, and redundancy is kept in place throughout, so cooling never stops.

What happens if savings fall below the guarantee?

We compensate the shortfall. The minimum saving is written into the contract and measured each month against a baseline agreed before any work starts.

Our engineers will analyse your plant and quantify your guaranteed savings potential, at no cost and with no obligation.

Request a free cooling audit