Thinking, techniques and news on Cooling-as-a-Service and AI-driven HVAC optimization.Cooling towers: range, approach and why they decide chiller efficiency
A cooling tower sets the temperature your chiller has to reject heat into. What range and approach mean, how water treatment protects efficiency, and what to check.Variable speed drives in chiller plants: where they save and where they do not
Drives on pumps, tower fans and chillers can cut energy sharply at part load, but only with the right control. A practical guide for plant engineers.Chiller staging and part-load efficiency: running the right machines
Chiller plants run at part load most of the year. How IPLV describes part-load efficiency and how staging decisions change your electricity bill.Rooftop solar and efficient cooling: why they work better together
Cooling demand and solar output both peak in the daytime. Why factories and buildings should cut cooling load first, then add solar, and how both can be done without upfront investment.How to prepare for a chiller plant energy audit
A good audit depends on good data. The documents, readings and access to prepare, what happens on site, and what you should receive afterwards.Cooling-as-a-Service vs leasing a chiller: which costs you less?
Both avoid an upfront investment. The difference is who carries the risk if the plant saves less than expected. A side-by-side comparison for Thai factories and buildings.How TOU tariffs and the Ft charge affect your chiller’s electricity cost
Thai TOU tariffs price peak-hour electricity higher and the Ft charge moves every four months. How that shapes chiller plant costs, and what lowers them.Designated factories and buildings: what Thailand’s energy law means for your chillers
Thailand’s Energy Conservation Promotion Act sets duties for large factories and buildings. Who is covered, what is required, and where the chiller plant fits.Cooling for food and beverage factories: process, hygiene and energy
Food and beverage plants depend on reliable cooling for product safety and quality. Where chilled water is used, where energy is lost, and how to improve without risk.Cooling for pharmaceutical and cleanroom production
Cleanrooms rely on chilled water to control temperature and humidity around the clock. How to make the cooling plant efficient while protecting GMP compliance.Cooling-as-a-Service vs an ESCO contract in Thailand
Both promise energy savings, but they differ in who funds, owns and runs the plant. A clear comparison for Thai building owners and factory managers.Refrigerant phase-down: what it means for older chillers in Thailand
R-22 is being phased out and HFCs are being phased down under the Kigali Amendment, which Thailand ratified in 2024. What that means for your chiller plant.What is Cooling-as-a-Service (CaaS)? A plain-English guide
Cooling-as-a-Service means a provider funds, owns and runs your chiller plant and you pay for the cooling. How it works, who it suits and what to check in a contract.What does a chiller replacement cost? The factors that set the price
Chiller replacement prices vary widely. These are the factors that decide the cost of a new plant in Thailand, and how to replace one without capital spending.kW/TR explained: how to benchmark your chiller plant’s efficiency
kW/TR is the simplest way to see how efficiently a chiller plant turns electricity into cooling. How to calculate it, what to include, and how to use it to find savings.How long is a Cooling-as-a-Service contract, and what happens at the end?
Cooling-as-a-Service contracts typically run 5–10 years. What decides the length, what happens to the equipment at the end of the term, and the questions to settle before you sign.Cooling-as-a-Service for CFOs: 8 questions to ask before you sign
A finance-side checklist for Cooling-as-a-Service: cash flow, balance-sheet treatment, guarantees, measurement and end-of-term options, with the questions to ask a provider.10 ways to cut your chiller plant’s energy use
Practical ways to reduce chiller plant electricity: sequencing, setpoints, variable speed, condenser care and controls. What each one does and where to start.7 signs your chiller plant needs replacing
Rising energy use, frequent breakdowns, phased-out refrigerant and comfort complaints: the signs that a chiller plant is reaching the end of its life, and what to do next.Water-cooled vs air-cooled chillers: which suits your building?
How water-cooled and air-cooled chillers differ in efficiency, space, water use, maintenance and cost, and how to choose for a Thai building.Chiller plant maintenance checklist: daily to annual tasks
A practical maintenance checklist for chilled-water plants: what to check daily, monthly and every year to keep chillers efficient and reliable.IPMVP options A, B, C and D explained
The International Performance Measurement and Verification Protocol offers four options for proving energy savings. What each one measures and when it is used.Data center cooling and PUE: how cooling efficiency drives the number
What Power Usage Effectiveness (PUE) measures, why cooling is the biggest lever, and how to improve it without putting uptime at risk.How hotels and resorts can cut cooling costs without hurting guest comfort
Cooling is often a hotel’s largest electricity load. Practical ways for Thai hotels and resorts to reduce chiller energy while keeping guests comfortable.Hospital cooling redundancy explained: N, N+1 and 2N
What N, N+1 and 2N mean for hospital chiller plants, which areas need which level of redundancy, and how to stay efficient while protecting uptime.Our first Cooling-as-a-Service plant enters commissioning
Infinity CoolMaster’s first chiller-as-a-service plant, for Platinum Pro Plastic, is in testing and commissioning in November 2026. What is being installed, how savings will be measured, and what comes next.Process cooling for plastics factories: chillers, moulds and energy
How chilled water is used in plastic injection moulding, blow moulding and extrusion, why it drives cycle time and quality, and where plastics plants lose cooling energy.The CFO’s guide to Cooling-as-a-Service
How Cooling-as-a-Service changes capital, risk and reporting for the finance team — and what a performance contract really covers.IPMVP explained: how guaranteed savings are actually measured
No savings claim is credible without a baseline. Here’s how Option C whole-facility measurement works in practice.