How to prepare for a chiller plant energy audit

1 min read

An energy audit of a chiller plant is quick when the right information is ready, and vague when it is not. This checklist covers what to prepare so the audit produces numbers you can act on.

Documents to collect

  • Electricity bills for the last 12 months, and 15-minute interval data if your utility or meters provide it.
  • An equipment list: chillers, pumps, cooling towers and air handlers, with capacity, rated power, age and refrigerant.
  • Chilled water and condenser water schematics, and the electrical single-line diagram.
  • Operating logs: supply and return temperatures, pressures, currents and run hours.
  • Maintenance records and a list of known problems.

Information about how the site runs

  • Operating hours and production or occupancy schedules.
  • Critical areas that cannot lose cooling, and required temperatures.
  • Planned expansions, shutdown windows and space available for new equipment.

Access the auditor needs

  • The plant room, roof, electrical rooms and main air handlers.
  • Trend data from the building management system, if there is one.
  • Permission to install temporary power and temperature loggers.
  • A contact from engineering and one from finance.

What happens on site

  • A walk-through of the plant and the main cooling loads.
  • Spot measurements of power, flow and temperatures.
  • Logging over several days to capture how load changes.

What you should receive

  • A baseline: how much energy the plant uses now and its kW/TR.
  • A list of measures with expected savings and what each depends on.
  • A proposal with the guaranteed saving and how it will be measured.