Cooling-as-a-Service for CFOs: 8 questions to ask before you sign

3 Nov 2026
Guide
Cooling-as-a-Service for CFOs: 8 questions to ask before you sign

2 min read

For a CFO, Cooling-as-a-Service (CaaS) is a financing and risk decision as much as an engineering one. The provider funds, owns and operates the chiller plant, and you pay for cooling out of the savings. These are the questions to ask before you sign.

1. What happens to our cash flow?

There is no upfront investment. The service fee is designed to be covered by the energy savings, so cooling costs should fall from the first month. Ask the provider to show the expected monthly cash flow over the full term, with and without the guaranteed saving.

2. How is the contract treated in our accounts?

This depends on the contract terms and must be confirmed by your auditor. Under TFRS 16 (Thailand's equivalent of IFRS 16 on leases), a contract contains a lease if it gives you the right to control the use of an identified asset. Many service contracts, where the provider owns, operates and decides how to run the plant, may not meet that test, but the answer depends on the details. Bring your auditor in early and share the draft contract.

3. What exactly is guaranteed?

Ask for the guaranteed saving as a number in the contract, how it is calculated and what happens if it is missed. At Infinity CoolMaster the minimum is 10%, written into the contract, and any shortfall is compensated.

4. How are savings measured, and can we check them?

Savings should be measured against a baseline agreed before work starts, using an international method such as IPMVP. Ask:

  • How many months of data the baseline uses (at least 12 is good practice).
  • Which adjustments are allowed, for example for weather or occupancy.
  • Whether you or a third party can audit the data and calculations.

5. Who carries which risks?

  • Performance risk: the provider, through the savings guarantee.
  • Equipment failure, repairs and spare parts: should be the provider's.
  • Insurance of the plant: should be the provider's while it owns the equipment.
  • Changes to the building's use or occupancy: check how the baseline is adjusted.
  • Tariff changes: understand whether the fee and the savings are measured in energy (kWh) or in money.

6. What happens at the end of the term?

Typically you can renew or take ownership of the plant under transfer terms set at the start. Make sure those terms, and what you receive (records, drawings, software, data), are written down.

7. Can the provider deliver for the whole term?

A 5–10 year contract is a long relationship. Ask about the provider's engineering team, monitoring capability, financing behind the assets and references from existing clients.

8. How does it support our ESG reporting?

Monthly, metered energy data and verified savings provide auditable figures for energy, emissions and green-building reporting. Ask for the report format before you sign.

Next step

A free cooling audit gives you the numbers for these questions: we analyse 12 months of your electricity bills, survey your plant and return a written proposal with the guaranteed saving and contract terms.