2 min read
Power Usage Effectiveness (PUE) is the most widely used efficiency metric for data centers. It compares the energy the whole facility uses with the energy that reaches the IT equipment. Because cooling is the largest load after the IT itself, cooling efficiency decides most of the number.
PUE = total facility energy ÷ IT equipment energy
A PUE of 1.0 would mean every kilowatt-hour goes to IT. Anything above 1.0 is overhead: cooling, power distribution losses, lighting and other building loads. Measure it over a full year, because a single moment can look much better or worse than reality.
IT equipment turns almost all of its power into heat, and all that heat must be removed, 24 hours a day, in Thailand's hot and humid climate. Chillers, pumps, cooling towers, computer-room air handlers and fans together form the biggest share of the overhead.
Efficiency cannot come at the expense of availability. Two principles keep the risk low:
Cooling savings should be measured, not estimated. Metering the cooling plant and comparing it with an agreed baseline, in line with the IPMVP protocol, shows exactly how much of a PUE improvement comes from cooling.
Infinity CoolMaster designs, finances, installs and operates efficient, redundant cooling plants with no upfront cost. Optimisation starts in shadow mode, energy data is verified every month and supports your PUE reporting, and a minimum 10% saving is guaranteed in writing.